T Avenue Corridor Improvements

Status: Under Construction

Improvements include construction of two lanes of a four-lane boulevard of NW Douglas Pkwy and T Avenue adjacent to the future Public Safety Building site as well as an HMA overlay from the south side of the Public Safety site to the south side of Hickman Road. 

Project quantities: 190,000 CY of grading, 47,000 SY of subgrade preparation, 400 tons of cement treated subgrade, 5,400 CY of 6" modified subbase, 10,500 SY of 9" PCC pavement, 1,500 SY of 8" temporary PCC or HMA pavement, 6,100 tons of HMA pavement HT, 2,800 SY of PCC shared use path, 500 SY of 4" or 6" PCC sidewalk, 4,700 tons of granular surfacing, 9,200 LF of water main, 6,800 LF of sanitary sewer, 7,200 LF of storm sewer, 72 EA of intakes or manholes, 1 reinforced box culvert, traffic signalization, 10,300 LF of 2" conduit, 19,000 LF of fiber optic cable, 360 STA of pavement marking, signing, erosion control, surface restoration and miscellaneous related work and appurtenances.

Bid DateJuly 18, 2023
Estimated Cost$11,000,000
Estimated Start Date
Under construction
Estimated Completion Date
October 2024
Contractor
All-Star Concrete LLC
Engineer
Foth Infrastructure & Environment


Alice's Road Improvements

Status: under construction

This phase includes reconstruction of Alice’s Road between NE Horizon Drive and NE Dellwood Drive to increase roadway capacity. It will be 5-lane roadway section with two lanes in each direction and a center left turn lane/median. The full scope of the reconstruction efforts on Alice’s Road extends over a mile north to the Meredith Drive intersection. As a result, future improvements along the corridor will be phased into multiple projects to be completed over the next several construction seasons. Find all the project details and current road closures on the City of Clive project page.

Downtown Waukee Street Improvements

Status: 

Description coming soon!

Bid Date
Estimated Cost
Estimated Start Date

Estimated Completion Date

Contractor

Engineer


University Avenue Extension: Phase 1

Status: 

The City of Waukee is planning enhancements to University Avenue that will close the current gap and improve several roads that intersect with University. Find more details and renderings of the full project on the University Ave Extension page.

Bid Date
Estimated Cost
Estimated Start Date

Estimated Completion Date

Contractor

Engineer


Prairie Rose Trail

Status: Under Construction

The trail will extend from the Raccoon River Valley Trail along Hickman Road to the newly constructed pond on the north side of NW Douglas Parkway within proposed greenbelt owned by the City of Waukee. The project includes grading, PCC trail paving, storm sewer two prefabricated bridges, pavement markings, signing and associated work.

Bid DateJanuary 30, 2024
Estimated Cost$18,000,000
Estimated Start Date
April 2024
Estimated Completion Date
December 15, 2024
Contractor
Absolute Group
Engineer
Snyder & Associates